AR Crime Lab First Floor Restroom Renovations

Selective demolition of existing floor finishes (tile), walls, plumbing fixtures, toilet partitions and ceilings. Selective demolition of existing HVAC. Installation of new Ceiling System, Light Fixtures, Power Circuits, and A/C Devices. Installation of new Floor finishes, Walls, Wall Finishes, Doors, Ceilings (acoustical, gypsum board, fiberglass reinforced panels). Modifications to existing HVAC system.
Addenda (click to expand/collapse)
Download section as a Zip file free of charge
Name Size
Addendum No. 1 5.2 MB
Addendum No. 2 903.6 KB
Addendum No. 3 6.0 MB
Addendum No. 4 385.1 KB
Addendum No. 5 384.9 KB
Bid Form - Addendum No. 5 346.1 KB