AR Crime Lab First Floor Restroom Renovations
Selective demolition of existing floor finishes (tile), walls, plumbing fixtures, toilet partitions and ceilings. Selective demolition of existing HVAC. Installation of new Ceiling System, Light Fixtures, Power Circuits, and A/C Devices. Installation of new Floor finishes, Walls, Wall Finishes, Doors, Ceilings (acoustical, gypsum board, fiberglass reinforced panels). Modifications to existing HVAC system.
Addenda
(click to expand/collapse)
Name | Size | |||
Addendum No. 1 | 5.2 MB | |||
Addendum No. 2 | 903.6 KB | |||
Addendum No. 3 | 6.0 MB | |||
Addendum No. 4 | 385.1 KB | |||
Addendum No. 5 | 384.9 KB | |||
Bid Form - Addendum No. 5 | 346.1 KB |