LIT History Room, IT, Badging, Exit, Art Wall

The History, IT, Badging, Exit Lane & Art Wall work includes, but is not limited to the construction of an airport history room, IT offices, airport badging facilities, exit lane remodel, and a public art wall at the Clinton National Airport and is comprised of the alterations to the existing shell space to provide an exhibit-ready finished shell space to accommodate the airport’s history exhibit, renovation and expansion of the airport IT offices and badging facilities, remodel of the existing security checkpoint corridor to incorporate an automated one-way traffic security system, and alterations to the existing pre-security lobby wall to provide an art-ready display wall.
Bid Documents (click to expand/collapse)
Download section as a Zip file free of charge
Name Size
001 COVER 5.1 MB
002 g0.01 351.5 KB
003 g0.02 604.3 KB
004 g0.03 639.1 KB
005 g0.04 772.3 KB
006 g0.05 514.2 KB
007 g0.06 5.4 MB
008 a1.01-A 512.7 KB
009 a1.01-B 550.4 KB
010 a1.01-E 805.4 KB
011 a1.01-H 552.0 KB
012 a1.01-IT 337.2 KB
013 a2.01-B 631.8 KB
014 a2.01-E 828.8 KB
015 a2.01-IT 405.3 KB
016 a5.01-B 702.5 KB
017 a5.01-E 627.4 KB
018 a5.01-H 504.4 KB
019 a5.01-IT 344.5 KB
020 a8.01 403.0 KB
021 a8.02 517.0 KB
022 a8.10 477.2 KB
023 i9.01-B-IT 370.6 KB
024 i9.01-E-H 547.1 KB
025 F0.01 156.1 KB
026 F1.01 162.1 KB
027 F1.02 234.6 KB
028 P0.01 251.7 KB
029 P1.01 186.4 KB
030 M0.01 138.9 KB
031 M1.01 290.6 KB
032 M1.02 294.0 KB
033 M1.03 248.0 KB
034 M2.01 288.1 KB
035 E0.01 154.2 KB
036 E1.01 267.7 KB
037 E1.02 462.7 KB
038 E1.03 186.4 KB
039 E1.04 342.6 KB
040 E1.05 156.4 KB
041 E2.01 148.5 KB
042 E3.01 128.3 KB
043 E4.01 190.1 KB