LRCVB Governors Hall Entrances LR Convention
The scope of work consists of using C channel steel as an accent material to create an emphasis at three entry points in the Statehouse Convention Center Governor’s Hall. In addition to the C Channel steel, there will be new lay in ceiling tiles, lighting upgrades, wall mounted bottle fillers and necessary paint upgrades. In select locations inside the Governor’s Hall lay in ceiling tile and grid will need to be replaced. Replacement of doors and door hardware will be required at all metal doors throughout the Governor’s Hall. Five structural beams in hall IV will be scraped and repainted with intumescent paint.
Bid Documents
(click to expand/collapse)
Hard copies of plans and specifications are available for purchase at contractor’s expense, or files may be downloaded for free from our online plan room. For questions about accessing the documents please contact Memphis Reprographics at 901-590-4862.
Name | Size | ||||
A0-00 | 3.5 MB | ||||
A1-01 | 1.7 MB | ||||
A1-02 | 1.2 MB | ||||
A1-03 | 1.3 MB | ||||
A1-04 | 1.5 MB | ||||
A1-05 | 1.1 MB | ||||
A1-06 | 1.3 MB | ||||
A1-07 | 1.9 MB | ||||
A1-08 | 1.0 MB | ||||
A1-09 | 1.1 MB | ||||
A1-10 | 1.0 MB | ||||
A1-11 | 972.6 KB | ||||
E1-01 | 1.0 MB | ||||
E1-02 | 1.1 MB | ||||
PF0-00 | 1.0 MB | ||||
PF1-00 | 1.5 MB | ||||
PF1-01 | 1.0 MB |