Town of Collierville Wolf River Lateral IA Drop Inlet Bank Stabilization
This project includes of clearing and grubbing, installation of construction entrance/exit, grading, installation of articulating concrete matting, seeding, erosion control, installation of drainage pipe, inlet construction and other items of work as called for in the contract documents for a completed project.
Bid Documents
(click to expand/collapse)

Hard copies of plans and specifications are available for purchase at contractor’s expense, or files may be downloaded for free from our online plan room. For questions about accessing the documents please contact Memphis Reprographics at 901-590-4862.
Name | Size | |||
001 Sheet COVER | 646.7 KB | |||
002 Sheet 1 OF 9 | 1.6 MB | |||
003 Sheet 2 OF 9 | 1.6 MB | |||
004 Sheet 3 OF 9 | 1.4 MB | |||
005 Sheet 4 OF 9 | 1.8 MB | |||
006 Sheet 5 OF 9 | 1.4 MB | |||
007 Sheet 6 OF 9 | 1.3 MB | |||
008 Sheet 7 OF 9 | 2.1 MB | |||
009 Sheet 8 OF 9 | 4.4 MB | |||
010 Sheet 9 OF 9 | 2.5 MB |